Chemistry-Physics-Mathematics building under construction, February 1959. The steel frame was erected by C.W. Carry Ltd and Calgary Structural Steel Ltd.
Physical Sciences Auditorium with 400 sloping seats full of students. The auditorium was housed in a seperate wing to the North of the Mathematics-Physics building and was used for large lecture classes, special lectures and public meetings. A projection booth is also located at the back of the room.
Physical Science Center at the University of Alberta, August 1980.
Chemistry-Physics-Mathematics building under construction, April 1959. The steel frame was erected by C.W. Carry Ltd and Calgary Structural Steel Ltd.
Physical Science Center at the University of Alberta construction completed to house three departments: Physics, Mathematics and Chemistry, October 1960.
Physical Science Center at the University of Alberta built to house three departments of Physics, Mathematics and Chemistry. The building officially opened May 24, 1961 and was designed by the Department of Public Works.
Chemistry-Physics-Mathematics building under construction with steel beams in place, September 21, 1959.